Bullet does not change in order to keep the previous symbol
Asked By
0 points
N/A
Posted on - 02/27/2012
I want to create a text box in default format with bullets and other symbols that includes to the bullets. This is a simple thing. But whenever I tab (shift+alt+arrow) in the levels the symbol of bullet does not change in order to keeping the previous symbol. I tried to create that text box with right font and size and any other thing.
How can I do this ?








